Cargando…
The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
The ATLAS SemiConductor Tracker (SCT) had been maintained during the long shutdown 2 (LS2) and restarted operations in LHC Run-3. As reported in the previous VERTEX conference, the SCT successfully operated in LHC Run-2 (2015-2018) which came with high instantaneous luminosity and pileup conditions...
Autor principal: | Borecka-Bielska, Hanna Maria |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2838345 |
Ejemplares similares
-
The operational experience and performance of the ATLAS SCT during Run-2 and LS2, and the first impression from Run3 operations.
por: ATLAS SCT Collaboration, et al.
Publicado: (2023) -
The operational experience, challenges and performance of the ATLAS Semiconductor Tracker during LHC Run-2 and SCT operation prospect for Run-3
por: Schopf, Elisabeth
Publicado: (2022) -
The operational experience, challenges and performance of the ATLAS Semiconductor Tracker during LHC Run-2 and SCT operation prospect for Run-3
por: Schopf, Elisabeth
Publicado: (2022) -
The performance and operational experience of the ATLAS Semiconductor Tracker (SCT) during LHC Run 2
por: Harris, Ynyr
Publicado: (2021) -
First impressions of LHC Run 3: Operations
por: Franchino, Silvia
Publicado: (2022)