Cargando…
DT Phase 2 Slice Test performance in early Run 3 collisions
During Long Shutdown 2 one sector of the CMS DT detector has been instrumented with front-end and back-end prototypes of the DT Phase-2 upgrade electronics intended to operate during HL-LHC. The chamber FE signals are split and fed into both the legacy system and this new electronics. One of the bac...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2841538 |