Cargando…
DT Phase 2 Slice Test performance in early Run 3 collisions
During Long Shutdown 2 one sector of the CMS DT detector has been instrumented with front-end and back-end prototypes of the DT Phase-2 upgrade electronics intended to operate during HL-LHC. The chamber FE signals are split and fed into both the legacy system and this new electronics. One of the bac...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2841538 |
Ejemplares similares
-
Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
por: CMS Collaboration
Publicado: (2021) -
DT Slice Test demonstrator results
por: CMS Collaboration
Publicado: (2020) -
DT Slice Test 2021 Calibration Stability plots
por: CMS Collaboration
Publicado: (2022) -
Analytical Method (AM) for DT Trigger Primitive Generation in Phase 2. Slice Test Results with 2021 cosmics data
por: CMS Collaboration
Publicado: (2021) -
Collision induced background in the DT chambers
por: CMS Collaboration
Publicado: (2013)