Cargando…
CMS Tracker Alignment activities during LHC Long Shutdown 2
The strategies for and the performance of the CMS tracker alignment during the 2021-2022 LHC commissioning preceding the Run 3 data-taking period are described. The results of the very first tracker alignment after the pixel reinstallation, performed with cosmic ray muons recorded with the solenoid...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.414.0633 http://cds.cern.ch/record/2841558 |