Cargando…
Assembly operation of the first Orbit Corrector prototype MCBXFA for HL-LHC
CERN and CIEMAT team performed the assembly of the first long Orbit Corrector MCBXFA in Building 927 (Prévessin site). This first prototype will be assembled in the Corrector Package cold mass for HL-LHC to be installed in the IT String. HL-LHC Inner Triplet (IT) STRING comprises all circuits from Q...
Autor principal: | |
---|---|
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2843359 |