Cargando…

Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex

The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. During the Long Shutdown 2 (LS2), majo...

Descripción completa

Detalles Bibliográficos
Autores principales: Vergara Fernandez, Estrella, Ansel, Antoine, Barberan Marin, Maria, Bernardini, Marzia, Chemli, Samy, Coupard, Julie, Foraz, Katy, Hay, David, Jimenez, José, Mcfarlane, David, Pedrosa, Fernando, Pirozzi, Michela, Tock, Jean-Philippe
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK009
http://cds.cern.ch/record/2845802