Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex

The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. During the Long Shutdown 2 (LS2), majo...

Descripción completa

Detalles Bibliográficos
Autores principales: Vergara Fernandez, Estrella, Ansel, Antoine, Barberan Marin, Maria, Bernardini, Marzia, Chemli, Samy, Coupard, Julie, Foraz, Katy, Hay, David, Jimenez, José, Mcfarlane, David, Pedrosa, Fernando, Pirozzi, Michela, Tock, Jean-Philippe
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK009
http://cds.cern.ch/record/2845802
_version_ 1780976580675239936
author Vergara Fernandez, Estrella
Ansel, Antoine
Barberan Marin, Maria
Bernardini, Marzia
Chemli, Samy
Coupard, Julie
Foraz, Katy
Hay, David
Jimenez, José
Mcfarlane, David
Pedrosa, Fernando
Pirozzi, Michela
Tock, Jean-Philippe
author_facet Vergara Fernandez, Estrella
Ansel, Antoine
Barberan Marin, Maria
Bernardini, Marzia
Chemli, Samy
Coupard, Julie
Foraz, Katy
Hay, David
Jimenez, José
Mcfarlane, David
Pedrosa, Fernando
Pirozzi, Michela
Tock, Jean-Philippe
author_sort Vergara Fernandez, Estrella
collection CERN
description The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. During the Long Shutdown 2 (LS2), major projects were implemented such as the LHC Injectors upgrade and the LHC Dipoles Diodes consolidation. The installation of some equipment of the HL-LHC project took also place. This paper presents the application to the LS2 of the processes and tools to managed CERN programmed stops: it covers the preparation, implementation and follow up phases, as well as the KPIs, the tools used to build a coherent schedule and to follow up and report the progress. The description of the methodology to create a linear schedule, as well the construction of automatised broken lines and progress curves are detailed. It also describes the organizational set-up for the coordination of the works, the main activities and the key milestones. The impact of the COVID-19 on the long shutdown will be described, especially the strategy implemented to minimise its consequences.
id cern-2845802
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28458022023-06-07T13:08:59Zdoi:10.18429/JACoW-IPAC2022-WEPOTK009http://cds.cern.ch/record/2845802engVergara Fernandez, EstrellaAnsel, AntoineBarberan Marin, MariaBernardini, MarziaChemli, SamyCoupard, JulieForaz, KatyHay, DavidJimenez, JoséMcfarlane, DavidPedrosa, FernandoPirozzi, MichelaTock, Jean-PhilippeProcesses and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator ComplexAccelerators and Storage RingsThe preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. During the Long Shutdown 2 (LS2), major projects were implemented such as the LHC Injectors upgrade and the LHC Dipoles Diodes consolidation. The installation of some equipment of the HL-LHC project took also place. This paper presents the application to the LS2 of the processes and tools to managed CERN programmed stops: it covers the preparation, implementation and follow up phases, as well as the KPIs, the tools used to build a coherent schedule and to follow up and report the progress. The description of the methodology to create a linear schedule, as well the construction of automatised broken lines and progress curves are detailed. It also describes the organizational set-up for the coordination of the works, the main activities and the key milestones. The impact of the COVID-19 on the long shutdown will be described, especially the strategy implemented to minimise its consequences.oai:cds.cern.ch:28458022022
spellingShingle Accelerators and Storage Rings
Vergara Fernandez, Estrella
Ansel, Antoine
Barberan Marin, Maria
Bernardini, Marzia
Chemli, Samy
Coupard, Julie
Foraz, Katy
Hay, David
Jimenez, José
Mcfarlane, David
Pedrosa, Fernando
Pirozzi, Michela
Tock, Jean-Philippe
Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
title Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
title_full Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
title_fullStr Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
title_full_unstemmed Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
title_short Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
title_sort processes and tools to manage cern programmed stops applied to the second long shutdown of the accelerator complex
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK009
http://cds.cern.ch/record/2845802
work_keys_str_mv AT vergarafernandezestrella processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT anselantoine processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT barberanmarinmaria processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT bernardinimarzia processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT chemlisamy processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT coupardjulie processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT forazkaty processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT haydavid processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT jimenezjose processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT mcfarlanedavid processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT pedrosafernando processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT pirozzimichela processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex
AT tockjeanphilippe processesandtoolstomanagecernprogrammedstopsappliedtothesecondlongshutdownoftheacceleratorcomplex