Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. During the Long Shutdown 2 (LS2), majo...
Autores principales: | Vergara Fernandez, Estrella, Ansel, Antoine, Barberan Marin, Maria, Bernardini, Marzia, Chemli, Samy, Coupard, Julie, Foraz, Katy, Hay, David, Jimenez, José, Mcfarlane, David, Pedrosa, Fernando, Pirozzi, Michela, Tock, Jean-Philippe |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK009 http://cds.cern.ch/record/2845802 |
Ejemplares similares
-
Lessons Learned From the First Long Shutdown of the Lhc and Its Injector Chain
por: Foraz, Katy, et al.
Publicado: (2015) -
The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group
por: Perrot, Anne-Laure, et al.
Publicado: (2022) -
LS1 “First Long Shutdown of LHC and its Injector Chains”
por: Foraz, K, et al.
Publicado: (2014) -
LS1 “First Long Shutdown of LHC and its Injector Chains”
por: Foraz, K, et al.
Publicado: (2014) -
Programmed Stops Coordination: from Preparation to Completion
por: Vergara Fernandez, Estrella, et al.
Publicado: (2022)