Summary of the First Fully Operational Run of LINAC4 at CERN
In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST007 http://cds.cern.ch/record/2845817 |