Cargando…

Summary of the First Fully Operational Run of LINAC4 at CERN

In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster...

Descripción completa

Detalles Bibliográficos
Autores principales: Skowroński, Piotr, Bellodi, Giulia, Bielawski, Bartosz Przemyslaw, Borner, Robert, Di Giovanni, Gian Piero, Gousiou, Evangelia, Lallement, Jean-Baptiste, Lombardi, Alessandra, Mikulec, Bettina, Parra-Lopez, Julien, Roncarolo, Federico, Sanchez Alvarez, Jose-Luis, Scrivens, Richard, Timeo, Luca, Wegner, Rolf
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST007
http://cds.cern.ch/record/2845817
Descripción
Sumario:In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster synchrotron. In this paper we report on the achieved beam performance, availability, reproducibility and other operational aspects of LINAC4 during its first fully operational year. We also present the machine developments performed and the plans for future improvements.