Cargando…

Summary of the First Fully Operational Run of LINAC4 at CERN

In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster...

Descripción completa

Detalles Bibliográficos
Autores principales: Skowroński, Piotr, Bellodi, Giulia, Bielawski, Bartosz Przemyslaw, Borner, Robert, Di Giovanni, Gian Piero, Gousiou, Evangelia, Lallement, Jean-Baptiste, Lombardi, Alessandra, Mikulec, Bettina, Parra-Lopez, Julien, Roncarolo, Federico, Sanchez Alvarez, Jose-Luis, Scrivens, Richard, Timeo, Luca, Wegner, Rolf
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST007
http://cds.cern.ch/record/2845817
_version_ 1780976584141832192
author Skowroński, Piotr
Bellodi, Giulia
Bielawski, Bartosz Przemyslaw
Borner, Robert
Di Giovanni, Gian Piero
Gousiou, Evangelia
Lallement, Jean-Baptiste
Lombardi, Alessandra
Mikulec, Bettina
Parra-Lopez, Julien
Roncarolo, Federico
Sanchez Alvarez, Jose-Luis
Scrivens, Richard
Timeo, Luca
Wegner, Rolf
author_facet Skowroński, Piotr
Bellodi, Giulia
Bielawski, Bartosz Przemyslaw
Borner, Robert
Di Giovanni, Gian Piero
Gousiou, Evangelia
Lallement, Jean-Baptiste
Lombardi, Alessandra
Mikulec, Bettina
Parra-Lopez, Julien
Roncarolo, Federico
Sanchez Alvarez, Jose-Luis
Scrivens, Richard
Timeo, Luca
Wegner, Rolf
author_sort Skowroński, Piotr
collection CERN
description In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster synchrotron. In this paper we report on the achieved beam performance, availability, reproducibility and other operational aspects of LINAC4 during its first fully operational year. We also present the machine developments performed and the plans for future improvements.
id cern-2845817
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28458172023-01-11T21:31:22Zdoi:10.18429/JACoW-IPAC2022-MOPOST007http://cds.cern.ch/record/2845817engSkowroński, PiotrBellodi, GiuliaBielawski, Bartosz PrzemyslawBorner, RobertDi Giovanni, Gian PieroGousiou, EvangeliaLallement, Jean-BaptisteLombardi, AlessandraMikulec, BettinaParra-Lopez, JulienRoncarolo, FedericoSanchez Alvarez, Jose-LuisScrivens, RichardTimeo, LucaWegner, RolfSummary of the First Fully Operational Run of LINAC4 at CERNAccelerators and Storage RingsIn December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster synchrotron. In this paper we report on the achieved beam performance, availability, reproducibility and other operational aspects of LINAC4 during its first fully operational year. We also present the machine developments performed and the plans for future improvements.oai:cds.cern.ch:28458172022
spellingShingle Accelerators and Storage Rings
Skowroński, Piotr
Bellodi, Giulia
Bielawski, Bartosz Przemyslaw
Borner, Robert
Di Giovanni, Gian Piero
Gousiou, Evangelia
Lallement, Jean-Baptiste
Lombardi, Alessandra
Mikulec, Bettina
Parra-Lopez, Julien
Roncarolo, Federico
Sanchez Alvarez, Jose-Luis
Scrivens, Richard
Timeo, Luca
Wegner, Rolf
Summary of the First Fully Operational Run of LINAC4 at CERN
title Summary of the First Fully Operational Run of LINAC4 at CERN
title_full Summary of the First Fully Operational Run of LINAC4 at CERN
title_fullStr Summary of the First Fully Operational Run of LINAC4 at CERN
title_full_unstemmed Summary of the First Fully Operational Run of LINAC4 at CERN
title_short Summary of the First Fully Operational Run of LINAC4 at CERN
title_sort summary of the first fully operational run of linac4 at cern
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST007
http://cds.cern.ch/record/2845817
work_keys_str_mv AT skowronskipiotr summaryofthefirstfullyoperationalrunoflinac4atcern
AT bellodigiulia summaryofthefirstfullyoperationalrunoflinac4atcern
AT bielawskibartoszprzemyslaw summaryofthefirstfullyoperationalrunoflinac4atcern
AT bornerrobert summaryofthefirstfullyoperationalrunoflinac4atcern
AT digiovannigianpiero summaryofthefirstfullyoperationalrunoflinac4atcern
AT gousiouevangelia summaryofthefirstfullyoperationalrunoflinac4atcern
AT lallementjeanbaptiste summaryofthefirstfullyoperationalrunoflinac4atcern
AT lombardialessandra summaryofthefirstfullyoperationalrunoflinac4atcern
AT mikulecbettina summaryofthefirstfullyoperationalrunoflinac4atcern
AT parralopezjulien summaryofthefirstfullyoperationalrunoflinac4atcern
AT roncarolofederico summaryofthefirstfullyoperationalrunoflinac4atcern
AT sanchezalvarezjoseluis summaryofthefirstfullyoperationalrunoflinac4atcern
AT scrivensrichard summaryofthefirstfullyoperationalrunoflinac4atcern
AT timeoluca summaryofthefirstfullyoperationalrunoflinac4atcern
AT wegnerrolf summaryofthefirstfullyoperationalrunoflinac4atcern