Cargando…
Summary of the First Fully Operational Run of LINAC4 at CERN
In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster...
Autores principales: | Skowroński, Piotr, Bellodi, Giulia, Bielawski, Bartosz Przemyslaw, Borner, Robert, Di Giovanni, Gian Piero, Gousiou, Evangelia, Lallement, Jean-Baptiste, Lombardi, Alessandra, Mikulec, Bettina, Parra-Lopez, Julien, Roncarolo, Federico, Sanchez Alvarez, Jose-Luis, Scrivens, Richard, Timeo, Luca, Wegner, Rolf |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST007 http://cds.cern.ch/record/2845817 |
Ejemplares similares
-
Longitudinal Beam Profile Measurements in Linac4 Commissioning
por: Bellodi, Giulia, et al.
Publicado: (2014) -
Linac4: Reliability run results and source extraction studies
por: Noll, Daniel, et al.
Publicado: (2019) -
Redesign of CERN LINAC3 RFQ for Lead 29+
por: Benedetti, Stefano, et al.
Publicado: (2018) -
Transverse Beam Profile Measurements in the Linac4 Medium Energy Beam Transport
por: Yarmohammadi Satri, Masoomeh, et al.
Publicado: (2014) -
LINAC4 low energy beam measurements
por: Hein, L M, et al.
Publicado: (2012)