Cargando…

Implications and Mitigation of Radiation Effects on the CERN SPS Operation during 2021

During the Long Shutdown 2 (LS2, 2019-2020), the CERN accelerator complex has undergone major upgrades, mainly in preparation for the High-Luminosity (HL) LHC era, the ultimate capacity for its physics production. Therefore, several novel equipment and systems were designed and deployed throughout t...

Descripción completa

Detalles Bibliográficos
Autores principales: Aguiar, Ygor, Apollonio, Andrea, Biłko, Kacper, Brucoli, Matteo, Cecchetto, Matteo, Danzeca, Salvatore, García Alía, Ruben, Ladzinski, Tomasz, Lerner, Giuseppe, Potoine, Jean-Baptiste, Zimmaro, Alessandro
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOMS044
http://cds.cern.ch/record/2845823