Cargando…

Measurement and alignment of the TIDVG5 SPS beam dump

During the Long Shutdown 2 (LS2 2018-2021) the CERN injector complex was upgraded to meet the future High Luminosity-Large Hadron Collider (HL-LHC) re- quirements. One major activity was the construction and installation of a new beam dump, in the Super Proton Synchrotron (SPS), able to cope wi...

Descripción completa

Detalles Bibliográficos
Autores principales: Vendeuvre, Camille, Bestmann, Patrick, Barcet, Florian
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2849074