Cargando…
Measurement and alignment of the TIDVG5 SPS beam dump
During the Long Shutdown 2 (LS2 2018-2021) the CERN injector complex was upgraded to meet the future High Luminosity-Large Hadron Collider (HL-LHC) re- quirements. One major activity was the construction and installation of a new beam dump, in the Super Proton Synchrotron (SPS), able to cope wi...
Autores principales: | Vendeuvre, Camille, Bestmann, Patrick, Barcet, Florian |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2849074 |
Ejemplares similares
-
The SPS beam dump, TIDVG
por: Brice, Maximilien
Publicado: (2019) -
SPS internal beam dump TIDVG5 installation
por: Ordan, Julien Marius
Publicado: (2020) -
SPS beam dump shielding (TIDVG5) installation
por: Ordan, Julien Marius
Publicado: (2020) -
LIU-SPS Internal beam dump block (TIDVG5) in ECX5
por: Ordan, Julien Marius
Publicado: (2020) -
The millenium dump TIDVG commissioning - april 2000
por: Ross, M
Publicado: (2000)