Cargando…
Versatile Link$^{+}$ transceiver production
The Versatile Link$^{+}$ project targeting the Phase 2 HL-LHC detector upgrades is entering the production phase. After several years of prototyping, the industrialisation of the Versatile Link$^{+}$ Transceiver (VTRx$^{+}$) was launched in 2021 and the production is scheduled to start in 2022. We d...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/18/03/C03003 http://cds.cern.ch/record/2861853 |
_version_ | 1780977849435422720 |
---|---|
author | Soós, C Bergin, D E Detraz, S Lalović, M Marcon, L Olanterä, L Prousalidi, T Sandven, U Scarcella, C Sigaud, C Troska, J |
author_facet | Soós, C Bergin, D E Detraz, S Lalović, M Marcon, L Olanterä, L Prousalidi, T Sandven, U Scarcella, C Sigaud, C Troska, J |
author_sort | Soós, C |
collection | CERN |
description | The Versatile Link$^{+}$ project targeting the Phase 2 HL-LHC detector upgrades is entering the production phase. After several years of prototyping, the industrialisation of the Versatile Link$^{+}$ Transceiver (VTRx$^{+}$) was launched in 2021 and the production is scheduled to start in 2022. We describe the extensive qualification effort carried out and the quality assurance procedures put in place to monitor the manufacturing quality. We summarise the experience of the industrialisation and we present the plans for the production. |
id | cern-2861853 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2023 |
record_format | invenio |
spelling | cern-28618532023-06-14T18:27:10Zdoi:10.1088/1748-0221/18/03/C03003http://cds.cern.ch/record/2861853engSoós, CBergin, D EDetraz, SLalović, MMarcon, LOlanterä, LProusalidi, TSandven, UScarcella, CSigaud, CTroska, JVersatile Link$^{+}$ transceiver productionDetectors and Experimental TechniquesParticle Physics - ExperimentData Analysis and StatisticsThe Versatile Link$^{+}$ project targeting the Phase 2 HL-LHC detector upgrades is entering the production phase. After several years of prototyping, the industrialisation of the Versatile Link$^{+}$ Transceiver (VTRx$^{+}$) was launched in 2021 and the production is scheduled to start in 2022. We describe the extensive qualification effort carried out and the quality assurance procedures put in place to monitor the manufacturing quality. We summarise the experience of the industrialisation and we present the plans for the production.Abstract The Versatile Link+ project targeting the Phase 2 HL-LHC detector upgrades is entering the production phase. After several years of prototyping, the industrialisation of the Versatile Link+ Transceiver (VTRx+) was launched in 2021 and the production is scheduled to start in 2022. We describe the extensive qualification effort carried out and the quality assurance procedures put in place to monitor the manufacturing quality. We summarise the experience of the industrialisation and we present the plans for the production.oai:cds.cern.ch:28618532023 |
spellingShingle | Detectors and Experimental Techniques Particle Physics - Experiment Data Analysis and Statistics Soós, C Bergin, D E Detraz, S Lalović, M Marcon, L Olanterä, L Prousalidi, T Sandven, U Scarcella, C Sigaud, C Troska, J Versatile Link$^{+}$ transceiver production |
title | Versatile Link$^{+}$ transceiver production |
title_full | Versatile Link$^{+}$ transceiver production |
title_fullStr | Versatile Link$^{+}$ transceiver production |
title_full_unstemmed | Versatile Link$^{+}$ transceiver production |
title_short | Versatile Link$^{+}$ transceiver production |
title_sort | versatile link$^{+}$ transceiver production |
topic | Detectors and Experimental Techniques Particle Physics - Experiment Data Analysis and Statistics |
url | https://dx.doi.org/10.1088/1748-0221/18/03/C03003 http://cds.cern.ch/record/2861853 |
work_keys_str_mv | AT soosc versatilelinktransceiverproduction AT berginde versatilelinktransceiverproduction AT detrazs versatilelinktransceiverproduction AT lalovicm versatilelinktransceiverproduction AT marconl versatilelinktransceiverproduction AT olanteral versatilelinktransceiverproduction AT prousalidit versatilelinktransceiverproduction AT sandvenu versatilelinktransceiverproduction AT scarcellac versatilelinktransceiverproduction AT sigaudc versatilelinktransceiverproduction AT troskaj versatilelinktransceiverproduction |