Cargando…

Discharge rate and short circuits in GEM in 2022 and 2023

GE1/1 chambers in 2022 were affected by frequent protection turn off of the High Voltage power (HV trip) during the first LHC fills (8 colliding bunches). This was due to the occurrence of discharges inside of the detector. The main hypothesis is that the occurrence of discharges is favoured by the...

Descripción completa

Detalles Bibliográficos
Autor principal: CMS Collaboration
Lenguaje:eng
Publicado: 2023
Materias:
Acceso en línea:http://cds.cern.ch/record/2865839