Cargando…
Discharge rate and short circuits in GEM in 2022 and 2023
GE1/1 chambers in 2022 were affected by frequent protection turn off of the High Voltage power (HV trip) during the first LHC fills (8 colliding bunches). This was due to the occurrence of discharges inside of the detector. The main hypothesis is that the occurrence of discharges is favoured by the...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2865839 |
Ejemplares similares
-
GEM Cosmic Ray Muons in 2020
por: CMS Collaboration
Publicado: (2021) -
Fraction of read-out VFAT3 chips in CMS GE1/1 Muon Chambers in 2022 and 2023
por: CMS Collaboration
Publicado: (2023) -
Short circuits in GE1/1 detectors
por: CMS Collaboration
Publicado: (2023) -
Discharges in GE1/1 during Run 3 July and August 2022 operations
por: CMS Collaboration
Publicado: (2023) -
Rate Capability and Discharge Behaviour of ME0 triple-GEM detector
por: Slaston, Yevhenii
Publicado: (2022)