Cargando…
Construction and commissioning of the RFQ for the CERN lead-ion facility
Autores principales: | Bezzon, G P, Lombardi, A M, Parisi, G, Pisent, A, Weiss, M, Bourquin, P, Vretenar, Maurizio |
---|---|
Lenguaje: | eng |
Publicado: |
1995
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/318958 |
Ejemplares similares
-
The matching line between the RFQ and the IH Linac of the CERN lead ion facility
por: Facco, A, et al.
Publicado: (1995) -
Comparison study of RFQ structures for the lead ion linac at CERN
por: Lombardi, A M, et al.
Publicado: (1992) -
Analysis of the end regions of the CERN lead-ion 4-rod RFQ
por: Andreev, V A, et al.
Publicado: (1993) -
Beam dynamics studies for the CERN lead-ion RFQ
por: Amendola, G, et al.
Publicado: (1992) -
Beam dynamics studies for the CERN lead-ion RFQ
por: Amendola, G, et al.
Publicado: (1992)