Cargando…
Beam optics issues for the antiproton decelerator
The deceleration of the beam down to 0.1 GeV/c in the ring previously used as Antiproton Collector (AC) at 3.5 GeV/c, requires a number of modifications to the lattice. The insertion of the electron cooling, needed to cool the antiproton beam at low energy, implies the re-arrange-ment of quadrupoles...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1997
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/330855 |