Cargando…

SPS Beams for LHC: RF Beam Control to Minimize Rephasing in the SPS

After acceleration to 450 GeV/c in the SPS, the proton beams for the LHC must be rephased in order to be injected into the correct place in the collider. If the position before rephasing is random, th e beam must be rotated by up to 1/14th of an SPS turn. This procedure will take about 330 ms on the...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Linnecar, Trevor Paul R, Stellfeld, D, Wehrle, U
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/360832