Cargando…
Beams in the CERN PS complex after the RF upgrades for LHC
In preparation for the Large Hadron Collider (LHC), extensive modifications have been made to the RF equipment of the PS Booster (PSB) and of the PS during the winter shut down 97-98. Low-frequency RF systems (0.6 - 1.8 MHz and 1.2 - 3.9 MHz) have been installed in the PSB and fixed frequency (40 an...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/361132 |