Cargando…
Study of emittance blow-up sources between the PS booster and the 26 GeV PS
The tight transverse emittance budget for the bright beams foreseen for the LHC era demands that all sources of emittance blow-up in the injector chain are reduced to a minimum. A critical region is the transfer between the PS Booster (PSB) and the 26 GeV PS. The four rings of the PSB run with RF ha...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/371832 |