Cargando…

Operation of the CERN PS-Booster above 1 GeV: saturation effects in the main bending magnets and required modifications

The PS-Booster consists of four superimposed rings. The bending magnets are made from single yokes with four 'C'-type gaps. This geometry leads to an inherent asymmetry in the flux distribution around inner (II, III) and outer (IV, I) rings. From 1999 the PS-Booster is foreseen to be opera...

Descripción completa

Detalles Bibliográficos
Autores principales: Benedikt, Michael, Carli, Christian
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/372251