Cargando…
Operation of the Four 12 kW at 4.5 K Refrigerators for LEP
In 1998 the first energy upgrade of the LEP Electron/Positron collider, LEP2, was completed at CERN. Sixty-eight superconducting modules supplied by four 12 kW @ 4.5 K equivalent power refrigerators have been operated allowing a colliding beam energy of 94.5 GeV. Meanwhile, the operation and mainten...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/410388 |