Cargando…

Operation of the Four 12 kW at 4.5 K Refrigerators for LEP

In 1998 the first energy upgrade of the LEP Electron/Positron collider, LEP2, was completed at CERN. Sixty-eight superconducting modules supplied by four 12 kW @ 4.5 K equivalent power refrigerators have been operated allowing a colliding beam energy of 94.5 GeV. Meanwhile, the operation and mainten...

Descripción completa

Detalles Bibliográficos
Autores principales: Bangert, N, Gayet, P
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/410388