Cargando…
ISR main control room
The ISR main control room (SRC) on the night of 20 October when beam was first successfully injected into Ring I. The panels along the left contain controls and observational information about the beam-transfer system and injection. Along the right are recorders showing beam intensity (in the centre...
Autor principal: | |
---|---|
Publicado: |
1970
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41402 |