Cargando…

ISR main control room

The ISR main control room (SRC) on the night of 20 October when beam was first successfully injected into Ring I. The panels along the left contain controls and observational information about the beam-transfer system and injection. Along the right are recorders showing beam intensity (in the centre...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1970
Materias:
Acceso en línea:http://cds.cern.ch/record/41402
_version_ 1780874847038996480
author CERN PhotoLab
author_facet CERN PhotoLab
author_sort CERN PhotoLab
collection CERN
description The ISR main control room (SRC) on the night of 20 October when beam was first successfully injected into Ring I. The panels along the left contain controls and observational information about the beam-transfer system and injection. Along the right are recorders showing beam intensity (in the centre) and controls for currents in the main magnets, the pole face windings, and auxiliary magnets, and the magnetic field display panel (further for the rear). At the far back are controls and observations for the r.f. system and the betatron-frequency meter. Also at the far back (in the centre) are oscilloscopes for looking at signals from the pick-up electrodes.
id cern-41402
institution Organización Europea para la Investigación Nuclear
publishDate 1970
record_format invenio
spelling cern-414022019-09-30T06:29:59Zhttp://cds.cern.ch/record/41402CERN PhotoLabISR main control roomComputers and Control RoomsThe ISR main control room (SRC) on the night of 20 October when beam was first successfully injected into Ring I. The panels along the left contain controls and observational information about the beam-transfer system and injection. Along the right are recorders showing beam intensity (in the centre) and controls for currents in the main magnets, the pole face windings, and auxiliary magnets, and the magnetic field display panel (further for the rear). At the far back are controls and observations for the r.f. system and the betatron-frequency meter. Also at the far back (in the centre) are oscilloscopes for looking at signals from the pick-up electrodes.CERN-PHOTO-7010616CERN-CO-7010616oai:cds.cern.ch:414021970
spellingShingle Computers and Control Rooms
CERN PhotoLab
ISR main control room
title ISR main control room
title_full ISR main control room
title_fullStr ISR main control room
title_full_unstemmed ISR main control room
title_short ISR main control room
title_sort isr main control room
topic Computers and Control Rooms
url http://cds.cern.ch/record/41402
work_keys_str_mv AT cernphotolab isrmaincontrolroom