Cargando…
High precision survey and alignment techniques in accelerator construction
Basic concepts of precision surveying are briefly reviewed, and an historical account is given of instruments and techniques used during the construction of the Proton Synchrotron (1954-59), the Intersecting Storage Rings (1966-71), and the Super Proton Synchrotron (1971). A nylon wire device, disti...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1974
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-1974-009-V-1.47 http://cds.cern.ch/record/416014 |