Cargando…

High precision survey and alignment techniques in accelerator construction

Basic concepts of precision surveying are briefly reviewed, and an historical account is given of instruments and techniques used during the construction of the Proton Synchrotron (1954-59), the Intersecting Storage Rings (1966-71), and the Super Proton Synchrotron (1971). A nylon wire device, disti...

Descripción completa

Detalles Bibliográficos
Autor principal: Gervaise, J
Lenguaje:eng
Publicado: CERN 1974
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-1974-009-V-1.47
http://cds.cern.ch/record/416014
_version_ 1780894738200657920
author Gervaise, J
author_facet Gervaise, J
author_sort Gervaise, J
collection CERN
description Basic concepts of precision surveying are briefly reviewed, and an historical account is given of instruments and techniques used during the construction of the Proton Synchrotron (1954-59), the Intersecting Storage Rings (1966-71), and the Super Proton Synchrotron (1971). A nylon wire device, distinvar, invar wire and tape, and recent automation of the gyrotheodolite and distinvar as well as auxiliary equipment (polyurethane jacks, Centipede) are discussed in detail. The paper ends summarizing the present accuracy in accelerator metrology, giving an outlook of possible improvement, and some aspects of staffing for the CERN Survey Group. (0 refs).
id cern-416014
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1974
publisher CERN
record_format invenio
spelling cern-4160142023-05-11T14:57:14Zdoi:10.5170/CERN-1974-009-V-1.47http://cds.cern.ch/record/416014engGervaise, JHigh precision survey and alignment techniques in accelerator constructionAccelerators and Storage RingsBasic concepts of precision surveying are briefly reviewed, and an historical account is given of instruments and techniques used during the construction of the Proton Synchrotron (1954-59), the Intersecting Storage Rings (1966-71), and the Super Proton Synchrotron (1971). A nylon wire device, distinvar, invar wire and tape, and recent automation of the gyrotheodolite and distinvar as well as auxiliary equipment (polyurethane jacks, Centipede) are discussed in detail. The paper ends summarizing the present accuracy in accelerator metrology, giving an outlook of possible improvement, and some aspects of staffing for the CERN Survey Group. (0 refs).CERNCERN-LabII-SU-74-2oai:cds.cern.ch:4160141974-04-19
spellingShingle Accelerators and Storage Rings
Gervaise, J
High precision survey and alignment techniques in accelerator construction
title High precision survey and alignment techniques in accelerator construction
title_full High precision survey and alignment techniques in accelerator construction
title_fullStr High precision survey and alignment techniques in accelerator construction
title_full_unstemmed High precision survey and alignment techniques in accelerator construction
title_short High precision survey and alignment techniques in accelerator construction
title_sort high precision survey and alignment techniques in accelerator construction
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-1974-009-V-1.47
http://cds.cern.ch/record/416014
work_keys_str_mv AT gervaisej highprecisionsurveyandalignmenttechniquesinacceleratorconstruction