Cargando…
High precision survey and alignment techniques in accelerator construction
Basic concepts of precision surveying are briefly reviewed, and an historical account is given of instruments and techniques used during the construction of the Proton Synchrotron (1954-59), the Intersecting Storage Rings (1966-71), and the Super Proton Synchrotron (1971). A nylon wire device, disti...
Autor principal: | Gervaise, J |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1974
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-1974-009-V-1.47 http://cds.cern.ch/record/416014 |
Ejemplares similares
-
High Precision Survey and Alignment of Large Linear Accelerators
por: Prenting, J, et al.
Publicado: (2004) -
High precision geodesy applied to CERN accelerators
por: Gervaise, Jean, et al.
Publicado: (1987) -
Alignment Techniques for the High Current AIRIX Accelerator
por: Bonnafond, C, et al.
Publicado: (1999) -
Mesures géodésiques de haute précision appliquées à la construction des accélérateurs de particules
por: Gervaise, J
Publicado: (1974) -
High precision instrumentation developed for CERN
por: Gervaise, Jean
Publicado: (1981)