Cargando…

The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972.

The metal structure of the shuttering used when pouring the concrete walls of the SPS tunnel gave this remarkable optical effect.

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1974
Materias:
Acceso en línea:http://cds.cern.ch/record/41836