Cargando…
The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972.
The metal structure of the shuttering used when pouring the concrete walls of the SPS tunnel gave this remarkable optical effect.
Autor principal: | |
---|---|
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41836 |
_version_ | 1780874894472380416 |
---|---|
author | CERN PhotoLab |
author_facet | CERN PhotoLab |
author_sort | CERN PhotoLab |
collection | CERN |
description | The metal structure of the shuttering used when pouring the concrete walls of the SPS tunnel gave this remarkable optical effect. |
id | cern-41836 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 1974 |
record_format | invenio |
spelling | cern-418362021-06-28T10:58:25Zhttp://cds.cern.ch/record/41836CERN PhotoLabThe SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972.Civil Engineering and InfrastructureThe metal structure of the shuttering used when pouring the concrete walls of the SPS tunnel gave this remarkable optical effect.CERN-PHOTO-7402048CERN-CE-7402048oai:cds.cern.ch:418361974 |
spellingShingle | Civil Engineering and Infrastructure CERN PhotoLab The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972. |
title | The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972. |
title_full | The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972. |
title_fullStr | The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972. |
title_full_unstemmed | The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972. |
title_short | The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972. |
title_sort | sps, with its 7 km circular tunnel, extended cern beyond the meyrin site. construction began in 1972. |
topic | Civil Engineering and Infrastructure |
url | http://cds.cern.ch/record/41836 |
work_keys_str_mv | AT cernphotolab thespswithits7kmcirculartunnelextendedcernbeyondthemeyrinsiteconstructionbeganin1972 AT cernphotolab spswithits7kmcirculartunnelextendedcernbeyondthemeyrinsiteconstructionbeganin1972 |