Cargando…
The SPS, with its 7 km circular tunnel, extended CERN beyond the Meyrin site. Construction began in 1972.
The metal structure of the shuttering used when pouring the concrete walls of the SPS tunnel gave this remarkable optical effect.
Autor principal: | CERN PhotoLab |
---|---|
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41836 |
Ejemplares similares
-
SPS main tunnel
por: CERN PhotoLab
Publicado: (1974) -
Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel.
por: CERN PhotoLab
Publicado: (1974) -
SPS switchyard
por: CERN PhotoLab
Publicado: (1974) -
North transfer tunnel
por: CERN PhotoLab
Publicado: (1972) -
Tunnel TT10
por: CERN PhotoLab
Publicado: (1972)