Cargando…
An important element of the "mole" : the wagon exchanger
These wagons transport the concrete vault sections for the first lining of the 4.80 m excavated tunnel and carry away the spoil.
Autor principal: | |
---|---|
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/41944 |