Cargando…

Installation for connecting systems between barrels YB0/YB-1

Positionning on barrel feet of one of the four connecting and locking system which will attach barrel YB0 and YB-1 for first prototype tests.

Detalles Bibliográficos
Autor principal: Pascal Petiot
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/42473