Cargando…

Installation for connecting systems between barrels YB0/YB-1

Positionning on barrel feet of one of the four connecting and locking system which will attach barrel YB0 and YB-1 for first prototype tests.

Detalles Bibliográficos
Autor principal: Pascal Petiot
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/42473
_version_ 1780874970853801984
author Pascal Petiot
author_facet Pascal Petiot
author_sort Pascal Petiot
collection CERN
description Positionning on barrel feet of one of the four connecting and locking system which will attach barrel YB0 and YB-1 for first prototype tests.
id cern-42473
institution Organización Europea para la Investigación Nuclear
publishDate 2001
record_format invenio
spelling cern-424732019-09-30T06:29:59Zhttp://cds.cern.ch/record/42473Pascal PetiotInstallation for connecting systems between barrels YB0/YB-1MagnetPositionning on barrel feet of one of the four connecting and locking system which will attach barrel YB0 and YB-1 for first prototype tests.CMS-PHO-MAGNET-2001-038oai:cds.cern.ch:424732001-09-18
spellingShingle Magnet
Pascal Petiot
Installation for connecting systems between barrels YB0/YB-1
title Installation for connecting systems between barrels YB0/YB-1
title_full Installation for connecting systems between barrels YB0/YB-1
title_fullStr Installation for connecting systems between barrels YB0/YB-1
title_full_unstemmed Installation for connecting systems between barrels YB0/YB-1
title_short Installation for connecting systems between barrels YB0/YB-1
title_sort installation for connecting systems between barrels yb0/yb-1
topic Magnet
url http://cds.cern.ch/record/42473
work_keys_str_mv AT pascalpetiot installationforconnectingsystemsbetweenbarrelsyb0yb1