Cargando…
Wake fields in HCS accelerator and CTS power line of the CLIC Test Facility (CTF II): simulation with program wake
One of the two parallel beam lines of the CTF II, (the 'Drive Beam') is providing the other (the accelerator) with 30 GHz power. Experimentation was performed in 98 and later with a CTF layout to study acceleration of a train of bunches with beam loading compensation, bunch length compress...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/434861 |