Cargando…
Novel Technique for the UX15 Cavern Vault Support System
The overall LHC project schedule requires the civil engineering work to begin before the final LEP shutdown. The new caverns for the ATLAS experiment will be built in and around the existing underground structures at point 1. In order to make the best possible use of the time available for the LHC c...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/435991 |