Cargando…

CESAR, 2 MeV electron storage ring; construction period; general view.

View over the nearly completed ring. The 2 drums at left are the RF cavities. The spectrometer line is at the right.

Detalles Bibliográficos
Autor principal: Service Photo
Lenguaje:ENG
Publicado: 1963
Materias:
Acceso en línea:http://cds.cern.ch/record/43718