Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets
CERN's LHC project has moved to an implementation phase. The fabrication of 1600 high-field superconducting magnets operating at 1.9 K will require about 6400 km of Nb-Ti cables. A cryogenic test facility has therefore been set up in order, on the one hand, to verify the quality of individual w...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/449266 |