Cargando…
Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets
CERN's LHC project has moved to an implementation phase. The fabrication of 1600 high-field superconducting magnets operating at 1.9 K will require about 6400 km of Nb-Ti cables. A cryogenic test facility has therefore been set up in order, on the one hand, to verify the quality of individual w...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/449266 |
_version_ | 1780896062766055424 |
---|---|
author | Barth, K Dauvergne, J P Delruelle, N Ferlin, G Juillerat, A C Pirotte, O |
author_facet | Barth, K Dauvergne, J P Delruelle, N Ferlin, G Juillerat, A C Pirotte, O |
author_sort | Barth, K |
collection | CERN |
description | CERN's LHC project has moved to an implementation phase. The fabrication of 1600 high-field superconducting magnets operating at 1.9 K will require about 6400 km of Nb-Ti cables. A cryogenic test facility has therefore been set up in order, on the one hand, to verify the quality of individual wires and, on the other hand, to control the critical current of the assembled cables. The facility is composed of a helium liquefier, a transfer line, a dewar and pumps. The paper describes the fully automatic operation of this installation and the different test cycles applied to these wires and cables. |
id | cern-449266 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2000 |
record_format | invenio |
spelling | cern-4492662023-05-31T13:22:04Zhttp://cds.cern.ch/record/449266engBarth, KDauvergne, J PDelruelle, NFerlin, GJuillerat, A CPirotte, OCryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles MagnetsAccelerators and Storage RingsCERN's LHC project has moved to an implementation phase. The fabrication of 1600 high-field superconducting magnets operating at 1.9 K will require about 6400 km of Nb-Ti cables. A cryogenic test facility has therefore been set up in order, on the one hand, to verify the quality of individual wires and, on the other hand, to control the critical current of the assembled cables. The facility is composed of a helium liquefier, a transfer line, a dewar and pumps. The paper describes the fully automatic operation of this installation and the different test cycles applied to these wires and cables.LHC-Project-Report-382CERN-LHC-Project-Report-382oai:cds.cern.ch:4492662000-07-26 |
spellingShingle | Accelerators and Storage Rings Barth, K Dauvergne, J P Delruelle, N Ferlin, G Juillerat, A C Pirotte, O Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets |
title | Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets |
title_full | Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets |
title_fullStr | Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets |
title_full_unstemmed | Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets |
title_short | Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets |
title_sort | cryogenic facilities at 1.9 k for the reception of the superconducting wires and cables of the lhc dipoles magnets |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/449266 |
work_keys_str_mv | AT barthk cryogenicfacilitiesat19kforthereceptionofthesuperconductingwiresandcablesofthelhcdipolesmagnets AT dauvergnejp cryogenicfacilitiesat19kforthereceptionofthesuperconductingwiresandcablesofthelhcdipolesmagnets AT delruellen cryogenicfacilitiesat19kforthereceptionofthesuperconductingwiresandcablesofthelhcdipolesmagnets AT ferling cryogenicfacilitiesat19kforthereceptionofthesuperconductingwiresandcablesofthelhcdipolesmagnets AT juilleratac cryogenicfacilitiesat19kforthereceptionofthesuperconductingwiresandcablesofthelhcdipolesmagnets AT pirotteo cryogenicfacilitiesat19kforthereceptionofthesuperconductingwiresandcablesofthelhcdipolesmagnets |