Cargando…
Cryogenic Facilities at 1.9 K for the Reception of the Superconducting Wires and Cables of the LHC Dipoles Magnets
CERN's LHC project has moved to an implementation phase. The fabrication of 1600 high-field superconducting magnets operating at 1.9 K will require about 6400 km of Nb-Ti cables. A cryogenic test facility has therefore been set up in order, on the one hand, to verify the quality of individual w...
Autores principales: | Barth, K, Dauvergne, J P, Delruelle, N, Ferlin, G, Juillerat, A C, Pirotte, O |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/449266 |
Ejemplares similares
-
Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
por: Pirotte, O, et al.
Publicado: (2020) -
New cryogenic facilities for testing superconducting equipments for the CERN Large Hadron Collider
por: Barth, K, et al.
Publicado: (1998) -
1.9 K Test Facility for the Reception of the Superconducting Cables for the LHC
por: Verweij, A P, et al.
Publicado: (1998) -
Cryogenic Characteristics of the ATLAS Barrel Toroid Superconducting Magnet
por: Pengo, R, et al.
Publicado: (2008) -
Results of the Cryogenic Tests of the Superconducting Magnets forming the Barrel Toroid of the ATLAS Experiment
por: Pengo, R, et al.
Publicado: (2006)