Cargando…

Comparison Of Discrete Klystron Produced Rf To Two Beam Produced Rf For Large Accelerator Systems

We compare here some technical aspects, and with it the cost, of constructing a 500 GeV center of mass Linear Collider with either Discrete Klystron or with Two-Beam (relativistic Klystron) technology using X-band for the main linac. A comparison concept is applied to CLIC and NLC technologies, but...

Descripción completa

Detalles Bibliográficos
Autor principal: Pitthan, R
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.1384399
http://cds.cern.ch/record/468127