Comparison Of Discrete Klystron Produced Rf To Two Beam Produced Rf For Large Accelerator Systems
We compare here some technical aspects, and with it the cost, of constructing a 500 GeV center of mass Linear Collider with either Discrete Klystron or with Two-Beam (relativistic Klystron) technology using X-band for the main linac. A comparison concept is applied to CLIC and NLC technologies, but...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.1384399 http://cds.cern.ch/record/468127 |
Sumario: | We compare here some technical aspects, and with it the cost, of constructing a 500 GeV center of mass Linear Collider with either Discrete Klystron or with Two-Beam (relativistic Klystron) technology using X-band for the main linac. A comparison concept is applied to CLIC and NLC technologies, but not to a particular CLIC or NLC design. The methodology created can be extended to higher c.m.s. energies, if the reader so desires. |
---|