Cargando…

Geometry and Alignment Requirements for the LHC Main Dipole

The 15 m long LHC superconducting dipole magnets, which contain two beam channels in a common mechanical structure, produce a magnetic field of 8.3 T required to deflect protons with 7 TeV/c momentum along a circular trajectory in the already existing LEP tunnel. The dipoles are bent in their horizo...

Descripción completa

Detalles Bibliográficos
Autores principales: Scandale, Walter, Bajko, M, Savary, F
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:http://cds.cern.ch/record/471343