Cargando…

Preliminary magnetic horn studies in the collection scheme for a neutrino factory

Neutrino factories rely on efficient targeting for a primary proton beam in the 2-16 GeV range and a collection scheme with very large acceptance for the pions produced from the target. A shaped solenoid with a peak field of 20 T tapered to 1.25 T has been suggested. In this note, some initial studi...

Descripción completa

Detalles Bibliográficos
Autores principales: Ball, A E, Blonde, A, Gilardoni, S S, Vassilopoulos, N
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S0168-9002(00)00406-X
http://cds.cern.ch/record/477020