Cargando…
Preliminary magnetic horn studies in the collection scheme for a neutrino factory
Neutrino factories rely on efficient targeting for a primary proton beam in the 2-16 GeV range and a collection scheme with very large acceptance for the pions produced from the target. A shaped solenoid with a peak field of 20 T tapered to 1.25 T has been suggested. In this note, some initial studi...
Autores principales: | Ball, A E, Blonde, A, Gilardoni, S S, Vassilopoulos, N |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0168-9002(00)00406-X http://cds.cern.ch/record/477020 |
Ejemplares similares
-
Updated Results of the Horn Study For the Neutrino Factory
por: Gilardoni, S S, et al.
Publicado: (2003) -
Updated results of the Horn Study for the Nufact
por: Ball, A E, et al.
Publicado: (2000) -
Proposal of a Four Horn Capture Scheme
por: Gilardoni, S S, et al.
Publicado: (2001) -
Study of a Horn with Integrated Target for a Neutrino Factory
por: Maugain, J M, et al.
Publicado: (2001) -
Study of targets and captures for a Neutrino Factory
por: Gilardoni, S S
Publicado: (2004)