Progress of the Electrical Installation Work for LHC

During the year 2000 the ST-EL group has performed a number of electrical installations within the LHC project. The 18 kV substation of zone 18 has been entirely renovated and the installations in the SD, SMA and SHM buildings terminated. In access point 5 the SX, SY, SH and SF buildings are either...