Cargando…

New calibrations and time stability of the response of the INTERCAST CR-39

We present new calibrations of different production batches (from 1989 to 1999) of the INTERCAST CR-39, using the BNL-AGS 1 A GeV iron beam. The comparison with previous results, obtained with the 158 A GeV lead beam from the CERN-SPS shows that, while each production batch has a different calibrati...

Descripción completa

Detalles Bibliográficos
Autores principales: Cecchini, S, Giacomelli, G, Giorgini, M, Patrizii, L, Serra, P
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S1350-4487(01)00120-2
http://cds.cern.ch/record/495810