Cargando…

A preliminary design of a dump for 2.2 GeV, 4MW proton beam

This note provides a first conceptual design of a dump to absorb the 4 MW proton beam emerging from the pion production target of a future CERN Neutrino Factory. This device has to be specially designed to cope with the enormous heating power density of the beam. The note deals with the design of th...

Descripción completa

Detalles Bibliográficos
Autores principales: Bruno, L, Silari, Marco, Vincke, H H
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/573735